Civil Construction contract agreements template

Construction Contract Agreement 


Construction contract agreement


Parties and Property

 

This agreement is executed on 18TH march, ............... between Er................................, having its Registered Office at.............., ................................................. acting through Shri ........................., (hereinafter called “the Contractor”), which term shall, unless repugnant to the context, include its legal representatives, of the one part and Client................. Ji(herein after called “the owner”), which term shall, unless the context otherwise admits, include his heirs, executors, administrators, legal representatives, nominees and assigns, of the other part.

 

Civil contract templet

WHEREAS the owner has plot at Permanand Nagar, ..................... (as specified in Schedule I) duly registered in name of his mother Smt. ................................................ the rights, title and interest therein absolutely vested in her;

 

AND WHEREAS the owner has requested the Contractor to build the House on ground floor, first floor according to the plan approved by mutual consent; and as agreed by the contractor with the specifications as mentioned in Schedule II and Schedule III.

 

AND WHEREAS the Contractor, has agreed to build the desired house(hereinafter called “the work”)

 

Now this AGREEMENT is reduced into writing and respective parts thereof shall be performed by the owner and the Contractor in accordance with the following terms and conditions:

Construction contract


Contracter of agreement

 

1.   The Contractor has agreed to complete the work within 10 months from the date of commencement of work. The parties agree that the Contractor is eligible for an extension of time under unforeseeable exceptional circumstances, weather conditions or upon failure of owner to pay the amount due at reasonable time. Extension of time will be agreed upon mutually.

 

2.   The Contractor will carry out following item of work: -

a.   Civil work:-

                                         i.    Excavation for foundation in any type of soil and up to the depth recommended by the Architect as and where needed.


                                        ii.    Structural members like Column, beam, footing and reinforcement used as per structural design.


                                       iii.    Muroom/malma/Dust filling with subbling within the plinth area and up to 2'6" depth plinth only.


                                      iv.    4” base concreting within the built-up area of the building.


                                       v.    8” outer and 4” partition wall and as necessary as per drawing.


                                      vi.    Single or double coat of internal and external plaster as needed.


b.   Finishing work:-

                                         i.    Installation of tiles

                                        ii.    Plumbing work

                                       iii.    Elecrtrical work

                                      iv.    Painting work

                                       v.    False ceiling


3.   The Contractor has agreed to carry out the work at..................rs/sqft on ground floor,...................rs/sqft first floor,....................... rs/sqft of labour quarter, ............................rs/sqft for water tank and Septic tank, ..................rs/rft for parapet wall, ...............................rs/rft for boundary wall upto 6’ height, ..............................rs/sqft for filling, subbling and base outside plinth.

 

4.   It is subject to the conditions and scope of work contained in schedule III. The owner will pay to the Contractorthe amount mentioned in schedule IV as cost of labor for construction and all other type of labor in the manner and at varying stages of the construction as described in Schedule IV.


5.   Initially the amount and payment schedule has been created as per drawing and the final payment shall be made as per actual built up area on the site.



SCHEDULE IV 

Payment Schedule Example:

 

Est. cost of construction=2882*400+1258*250+225*520=1584300

S.No.

Milestone

Percentage

amount

Remarks

1.

Upto Plinth

15%

2,37,645

For mobilization of materials and labor

2.

After Plinth level

15%

2,37,645

 

3.

After Gf slab completion

15%

2,37,645

 

4.

After FF slab completion

10%

1,58,430

 

5.

During Plaster

15%

2,37,645

 

6.

During finishing

30%

4,75,290

 

 

Total

100%

15,84,300

 


 

 

 

 

 

 

 

     Owner’s sign                                                           Contractor’s sign