CONTRACTOR DUTIES :-
1. MATERIAL RECEIVING , BILL CHECH & TROLLY SIZE MEASUREMENT
2. MATERIAL STORAGE CHECK
3. IF THERE IS A SHORTAGE OF MATERIAL, THEN INFORM IN THE RIGHT TIME
4. DO NOT KEEP MATERIAL IN THE ROAD OR OTHERS PLOT
5. DO NOT KEEP MATERIAL IN SUCH A PLACE THAT DISTURBS OTHERS
6. MAINTAIN DAILY CEMENT CUNSUMPTION REPORT
7. IF WORKING AT NIGHT CAUSES PROBLEM TO OTHERS THEN TRY NOT TO WORK AT NIGHT
9.WORK OF MIXING CONCRETE SHOULD NOT BE DONE IN THE ROAD
10. ENGINEERS INSTRUCTION SHOULD BE DONE IN THE GIVEN TIME
11. CURING MINIMUM 2 TIMES A DAY
12. KEEP THE CUTTING PIECE OF STEEL IN A SAPARATE PLACE
13. STEEL SHOULD NOT BE KEPT IN TOUCH WITH WATER AND SHOULD NOT RUST
14. DAY NIGHT SEQURITY
15. NO OTHER PERSON CAN ENTER THE SITE
16. DO NOT SHOW THE DRAWING TO ANYONE
17. COVER BLOCK SHOULD ALWAYS BE IN SITE